Major Works on a Block of Flats: Step by Step, from Survey to Handover
Major works on a block of flats involve a lot of people: the freeholder or RMC, the managing agent, a surveyor, the contractor and the leaseholders paying for it. Knowing the stages makes the whole thing smoother. Here is how a typical external refurbishment runs in London.
1. Condition Survey
A building surveyor inspects the building and reports what needs doing and how urgently. See our guide to building surveys before major works.
2. Specification
The surveyor turns the findings into a specification and schedule of works, so every contractor prices the same thing.
3. Section 20 Consultation
If any leaseholder’s contribution will go over the legal threshold, the landlord must consult before the work goes ahead. Read our Section 20 guide and try the Section 20 calculator.
4. Tender and Contractor Selection
Contractors price the specification. The best tenders are itemised clearly, so it is easy to compare like with like and to see what any extras will cost.
5. Mobilisation
Scaffold design, licences where needed, resident letters, access arrangements and site welfare are sorted before work starts.
6. Works on Site
Once the scaffold is up, hidden defects often appear. A good contractor photographs and prices them before doing the work, so there are no surprises later. Regular site meetings keep everyone informed.
7. Snagging and Handover
The work is checked against the specification, snags are put right and the scaffold comes down. You should receive a photo record and paperwork for the building file.
Avoiding Surprises in the Final Account
- Insist on an itemised price, not a lump sum
- Agree how extras will be measured and priced before work starts
- Ask for a photo record of every additional item
- Keep small defects fixed between programmes so they do not grow into big ones
Block Restoration delivers major works for managing agents and freeholders across London, and takes on small works and repairs between programmes.
Frequently Asked Questions
How long do major works on a block take?
For a typical London mansion block external refurbishment, expect several weeks to a few months on site, plus time beforehand for specification, consultation and scaffold design.
How often should a block be redecorated externally?
Many leases set a cycle, often around every five to seven years for external redecoration. Check the lease and the building’s maintenance plan.
Talk to Us About Your Building
Send us the address and what is needed and we will arrange a visit. Call 020 7971 1264 or request a quote online.